writemycdr logo

Get Expert CDR, RPL, Stage 1, and Stage 2 Competency Samples for Reference

Contact to require a detailed analysis and assessment of your plan.

    Get Free Consultation





    CDR Sample for Electrical Engineers

    Electrical Engineering is considered as the primary field of engineering that comprises the study and applications of electromagnetism and electric power. The Electrical Engineers from overseas with a wish to enhance their career in Australia are required to go through a CDR assessment by EA to get selected in the employment code: ANZSCO 233311. The engineers with four years of Bachelor’s degree in Electrical Engineering can apply for the post of Electrical Engineers.

    CDR sample for Electrical Engineers includes all the required reports such Curriculum Vitae (CV)Continuing Professional Development (CPD)three Career Episodes (CE)Summary Statement.The content of the CDR Report Samples is given below:

    Curriculum Vitae (CV): Resume on the basis of a professional template.

    Continuing Professional Development (CPD): The sample of CPD clarifies the Engineering Knowledge of the applicant – 270 words.

    Electrical Engineer Career Episode Sample 1: “DESIGN OF BRIDGELESS POWER FACTOR CORRECTION BOOST CONVERTER” – 1948 words.
    Electrical Engineer Career Episode Sample 2: “DESIGN AND INSTALLATION OF ELECTRICAL COMPONENTS FOR FIVE STOREY FULLY EQUIPPED HOSPITAL” – 2152 words.
    Electrical Engineer Career Episode Sample 3: “CONSTRUCTION OF AL-NAKHEEL MADINAH 110kv/13.8kv” – 2044 words.
    Electrical Engineer Summary Statement Sample: Detailed explanation of all the competency element – 1884 words.

    Electrical Engineering Career Episode 1

    Project Name: DESIGN OF BRIDGELESS POWER FACTOR CORRECTION BOOST CONVERTER

    Project Type: Academic Based Career Episode Project

    Demographics: This project was done during the final year of the author’s bachelor’s degree in electrical engineering from “Name of the university”. This project was accomplished successfully by the proper support and guidance of Mr Professor from July 2015 to December 2015, a period of six months.

    Engineering Activities of Electrical Engineering:

    1. To gather and organise information related to the project.
    2. To select the necessary hardware components required for the circuit design.
    3. To design the Bridgeless PFC Boost converter.
    4. To design the power control circuit and the control circuit with the use of devices and diodes.
    5. To use the optoisolator technique in the designed circuit.
    6. To design an instrument power supply for supplying the required power to the circuit.
    7.  To organise meetings with the supervisor, prepare progress reports and submit the report to the department.

    Problems & Solutions

    1. Problem 1 Career episode 1 and its solution

    Circuit isolation process

    The author used a resistor based current sensing in the circuit for solving the problem. It provided the necessary isolation between the power and the control circuit.

    2. Problem 2 Career episode 1 and its solution

    Output insufficient to drive the power from MOSFET gates.

    The author designed a drive circuit to provide the required signal for switching the MOSFET on or off as per the requirement. Moreover, the author used optoisolator in the driver circuit to prevent the circuit from the shock hazards.

    Electrical Engineering Career Episode 2

    Project Name: DESIGN AND INSTALLATION OF ELECTRICAL COMPONENTS FOR FIVE STOREY FULLY EQUIPPED HOSPITAL

    Project Type: Work Based Career Episode Project

    Demographics: This project from the company named ”Name of the company”. The head office of the company is located in “Name of the place”. The author carried out this project as electrical site engineer. This project was accomplished successfully by the proper support and guidance of Mr. from July 2015 to December 2015, a period of six months.

    Engineering Activities of Electrical Engineering:

    1. To conduct a document oriented study about project aspects.
    2. Then, prepare the bill of quantities to be used in the project site.
    3. To supervise and review various design drawings.
    4. To perform the related calculations and successively design the lighting system for the hospital.
    5. Afterwards, design the cable tray layout of the project.
    6. To install several electrical equipment such as RMU meter, main circuit breaker etc.
    7. Subsequently, install the grounding system and the lighting protection system
    8. To monitor the work of installation and prepare the related progress reports.

    Problems & Solutions

    Some of the major problem that was encountered during the DESIGN AND INSTALLATION OF ELECTRICAL COMPONENTS FOR FIVE STOREY FULLY EQUIPPED HOSPITAL along with their solutions are shown below:-

    1. Problem 1 Career Episode 2 and its solution

    Installation of cable tray

    The author first reviewed the overall design. The author consulted the HVAC engineer to find out that path of cable tray was inappropriate according to the HVAC requirements. Keeping that view in mind, the author performed the cable tray load calculations and successively changed the cable tray path.

    2. Problem 2 Career Episode 2 and its solution

    Designing part of lighting in switchgear room

    The author went back to the calculation part of the project regarding the lighting system. After reviewing the variables involved in the project, the author decided to calculate and redesign the lighting system using dialux software. The author noted down that after the redesign and calculation, the standardized illumination was achieved.

    Electrical Engineering Career Episode 3

    Project Name: CONSTRUCTION OF AL-NAKHEEL MADINAH 110kv/13.8kv

    Project Type: Work Based Career Episode Project

    Demographics: This project was done during the author’s work tenure at “Name of the organization”. The site location of the project was at “Name of the place”. This was a group project, and the author was assigned as the QA/QC Engineer for this project. The author worked on this from July 2015 to December 2015, a period of six months.

    Engineering Activities of Electrical Engineering:

    1. To acquire the detailed level of understanding related to the theoretical framework of the project and then move towards the survey phase.
    2. To perform necessary calculations for the design.
    3. To design the necessary battery banks, charger and circuit breaker.
    4. To perform the pre-inspection of the materials.
    5. To install and inspect the GIS, the switchgear and the power transformer.
    6. To inspect the tasks performed to prepare the technical specification for achieving quality outputs.
    7. To prepare the documentation of the project in the form of a final report.

    Problems & Solutions

    Some of the major problem that was encountered during the CONSTRUCTION OF AL-NAKHEEL MADINAH 110kv/13.8kv along with their solutions are shown below:-

    1. Problem 1 Career episode 3 and its solution

    Cable sealing end foundation

    The author coordinated with the civil team on site to prepare new coring for the sleeves present in line with the cable sealing end foundation. This ensured that a considerable reduction could be achieved in bending stress for cables. Thus, the application of this strategy helped to bring the high voltage cable sleeves in line with the sealing end foundation.

    2. Problem 2 Career episode 3 and its solution

    Vertical arrangement of the capacitor bank

    The author prepared a selection and design plan based on using the vertical framework of the capacitor bank to increase the area. The author contacted the supplier for manufacturing the capacitor banks in vertical stacking arrangement as per the substation.
    Scroll to Top