Get Expert CDR, RPL, Stage 1, and Stage 2 Competency Samples for Reference
Contact to require a detailed analysis and assessment of your plan.
CDR Sample for Electrical Engineering Draftsperson
CDR sample for Aeronautical Engineers includes all the required reports such Curriculum Vitae (CV), Continuing Professional Development (CPD), three Career Episodes (CE), Summary Statement.The content of the CDR Report Samples is given below:
Curriculum Vitae (CV): Resume on the basis of a professional template.
Electrical Engineering draftsperson Career Episode 1
Project Name: Design of Power Supply Using Reversible Pem Fuel Cell for the Domestic Loads
Project Type: Academic Based Career Episode
Engineering Activities of Electrical Engineering Draftsperson:
- To design the block diagram of the system, which included a basic block containing the various parameters needed for the system.
- To develop the circuit diagram of the power supply used in the system using Proteus software.
- To perform the simulation of the converter, inverters used in the project with the help of P spice software, which is the circuit analysis tool.
- To developed the prototype of the PEM fuel cell system by interfacing it with the boost converter used in the system.
- Finally, to assure the effective working of the PEM fuel cell by performing analysis of the developed fuel cell kit.
- To address them in group meetings and help them to understand various different aspect of the project.
- To record design, simulation result, and other information on MS Excel and MS word.
- To follow different codes and standard define by electrical and electronic engineering for designing, simulating and constructing the system.
Problems & Solutions
1. Problem 1 Career episode 1 and its solution
2. Problem 2 Career episode 1 and its solution
3. Problem 3 Career episode 1 and its solution
Electrical Engineering draftsperson Career Episode 2
Project Name: Design of the Ups System
Project Type: Academic Based Career Episode
Engineering Activities of Electrical Engineering Draftsperson:
- To design the basic block diagram of the system containing the rectifier, batteries and the inverter units in a suitable manner.
- To design the circuit diagram of the rectifiers using diodes and the resistors for the purposed system.
- To design a various circuit of the UPS system all alone but discussed the designing parameter with colleagues, which helped me to design an effective circuit.
- To design the circuit diagram of the inverter and battery for the purposed system.
- To develop the complete circuit of the UPS system on Proteus software.
- Finally, to simulate the final obtained circuit of UPS and concluded the final result obtained.
- To took reference of code and standard while designing a different circuit for the UPS system.
- To obey ICS 29.060.10 standard for electrical wires for connecting different components while designing and ICS 29.100.01 standard for electrical components.
Problems & Solutions
1. Problem 1 Career Episode 2 and its solution
2. Problem 2 Career Episode 2 and its solution
3. Problem 3 Career Episode 2 and its solution
Electrical Engineering draftsperson Career Episode 3
Project Name: Constructing of Electrical wiring and lighting system
Project Type: Work Based Career Episode
Engineering Activities of Aeronautical Engineer:
- To use the Microsoft PowerPoint to develop each floor layout and used the Lumen Method for the lighting design.
- To use the Lumen Method for the lightning design and extracted useful information such as room dimension, width and calculated the illuminance, area, maintenance factor, and so on.
- To extract the useful information such as room dimension, width and calculated the illuminance, area, maintenance factor, and so on.
- To determine the number of power points and lighting fittings required in each hostel floor and calculated the total load requirement.
- To develop the topology of distribution to determine all the consumers unit with the help of single phase-load
- Finally, to combine all the topology of the distribution system and developed the distribution reticulation.
- To follow the ICS 29.060.10 standard and ICS 29.120.50 standard for electric wiring and fuses in the building for protecting devices, respectively.
Problems & Solutions
1. Problem 1 Career episode 3 and its solution
2. Problem 2 Career episode 3 and its solution
3. Problem 3 Career episode 3 and its solution